FIVE months on and we still don’t have a proper repair to the potholes between the Twisted Oak and Woodleigh towards the A30.

Twice the large pothole has been semi-repaired with a wheelbarrow full of tarmac (a surveyor told me it would take three tons of tarmac to fill it).

The next drop of rain will take us right back where we started in January.

It’s a postcode lottery because the cost of the repair of the pothole is between Devon County Council and Teigbridge district and they can’t agree who is responsible.

George Davey

Crediton